ENT104 · Building an MVP with Lean Methods
About Course
Scope, build and test a minimum viable product using no-code tools and build-measure-learn cycles, so you learn from real users in weeks instead of months.
Who it is for
Founders and product builders with a validated problem who want to put a working first version in front of users quickly and cheaply.
Prerequisites
ENT102 is required and ENT103 is recommended; no programming experience is needed.
What you will be able to do
- Identify the riskiest assumption and choose the MVP type that tests it
- Scope an MVP with a user story map and MoSCoW prioritization
- Build a working no-code MVP connected to a spreadsheet data source
- Define activation and retention metrics and run one build-measure-learn cycle with real users
Lessons
- Lesson 1 · What an MVP is and how to scope it
- Lesson 2 · Building fast with no-code and low-code tools
- Lesson 3 · Build, measure, learn
- Lesson 4 · Lab and assignment
Lab: No-code MVP with a spreadsheet back end
You build a functional MVP in Glide or Softr using Google Sheets as the data source, covering only the must-have user stories. You add simple event logging to the sheet, then connect it to a Looker Studio report that shows activation and weekly usage.
Free tools: Glide or Softr free plan, Google Sheets and Looker Studio (free)
Assessed assignment
Build your MVP and test it with at least three real target users over one week. Submit a link or screenshots of the MVP, your user story map with MoSCoW labels, and an experiment log stating the hypothesis, the metric, the target and the actual result. Add a one-page learning memo describing what users did, what surprised you and whether you will persevere, pivot or stop. Do not collect sensitive personal data in the MVP.
| Criterion | Weight | What excellent work looks like |
|---|---|---|
| Scope discipline | 25% | The MVP covers only must-have stories tied to the riskiest assumption; nice-to-haves are explicitly deferred. |
| Working build | 25% | The MVP works end to end for the core job, with realistic data and no blocking errors. |
| Measurement | 25% | Activation and retention are clearly defined, tracked and reported against targets set before the test. |
| Learning memo | 25% | Observations are concrete, surprises are explored and the persevere, pivot or stop decision is justified by the data. |
Portfolio piece
A working no-code MVP, its story map and an experiment log with a learning memo.
Next step
Continue with ENT105 · Marketing, Sales and Growth for Startups · 8 hours · $56.00
Course Content
ENT104 · Building an MVP with Lean Methods (6 h)
-
Lesson 1 · What an MVP is and how to scope it
-
Lesson 2 · Building fast with no-code and low-code tools
-
Lesson 3 · Build, measure, learn
-
Lesson 4 · Lab and assignment
-
ENT104 Assessment · Building an MVP with Lean Methods
